Sunday, July 20, 2014

Siding, Septic, Flooring

Electrical Panel Complete

Well Pump is installed in the Mechanical Room, and powered.  We now have water via outdoor hoses (the only faucets that are installed.)

Siding continues and continues.  Every sunny day.  There's just lots of siding.  And thank you to all of our invaluable help.





Siding "Go-fer."

Ahhh... flooring.  We purchased a reclaimed maple gymnasium floor for about $1/ sq. foot, and after planing and sanding each piece by hand, we're now installing it.  At 1 "-width pieces, it will be a LONG project.  I'll keep you posted on the progress.  Here are the dining room and library, each now 1/2 done.






 
Septic tanks below the house.

Septic connection.

Septic drain field.

There's a short update; at least I didn't wait a whole month!  Next time, there will be pictures of the newly-poured garage floor; the last sections of drywall (bathroom and garage); more flooring, and siding.  And, perhaps some Raspberries, Blueberries, and Green Beans.  (It's Canning Season.)
 












No comments:

Post a Comment