Sunday, July 20, 2014
Siding, Septic, Flooring
| Electrical Panel Complete |
| Well Pump is installed in the Mechanical Room, and powered. We now have water via outdoor hoses (the only faucets that are installed.) |
| Siding continues and continues. Every sunny day. There's just lots of siding. And thank you to all of our invaluable help. |
| Siding "Go-fer." |
| Septic tanks below the house. |
| Septic connection. |
| Septic drain field. |