Inside the kitchen. More blue electrical boxes going in, and some roughed-in plumbing for the kitchen sink. |
Electrical wiring. Already, 1/2 mile of wire has been installed. (For real.) And they're not done yet. |
From the Stair Landing: The 1st floor and the basement. |
View of the 1st floor from the Basement Stairs. |
Patio door installed in the basement, marking the official end of window and door installation-- they're all in. |
Sunny basement, which we've been enlisted to thoroughly sweep this Saturday. The boys spent an evening out here last week, and already have some forts and hide-outs in the works. |
Bathtub's been installed. |
Laundry room plumbing. Fast-paced 10 days ahead. There's a lot of Electrical to be finished to get ready for the scheduled inspection. Then, after the Inspection, comes Insulation. |